I. |
RESIDENTIAL PROJECT: |
|
|
|
|
1.0 |
Cebu Hope Center - Kahayahay 1, Talamban, Cebu City |
Electrical Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't. Corp. |
18-May-2007 |
2.0 |
3-Storey w/ Attic Apartment - Lahug, Cebu City |
Electrical Design & Installation (Labor & Materials) |
Sub-Contract |
Riche Construction Services |
August, 2007 |
3.0 |
2 Storey, Duplex Apartment - Singson Village, Mandaue City |
Electrical & Auxilliary Installation - (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't. Corp. |
August 18,2007 |
4.0 |
Multi-Split Residential Unit - Silver Hills Subd., Talamban |
Electrical & Auxilliary Works Installation - (Labor & Materials) |
Prime |
Mr & Miss Chinky Bacalso |
Jan. 5, 2008 |
5.0 |
2-Storey Residential Building - Guadalupe, Cebu |
Electrical & Auxiliary Works (Labor/Eqpt. & Materials) |
Prime |
Engr. & Mrs. Seguismundo Exaltacion |
Dec. 14, 2009 |
6.0 |
2-Storey Residential Building - Apas Lahug, Cebu City |
Electrical & Auxiliary Works (Labor/Eqpt. & Materials) |
Sub-Contract |
DCD CONSTRUCTION INC |
Jan. 24, 2010 |
7.0 |
2-Storey Residential Building - Talamban, Cebu City |
Electrical & Auxiliary Works (Labor/Eqpt. & Materials) |
Prime |
Hon. & Mrs. Edgar dela Calzada |
August 30, 2010 |
8.0 |
Residential Subdivision - Tabunok, Talisay City, Cebu |
Electrical & Auxiliary Works (Labor/Eqpt. & Materials) |
Prime |
Mr. Basil Ting |
On-Going |
|
|
|
|
|
|
II. |
INSTITUTION PROJECT: |
|
|
|
|
II.1 |
Churches: |
|
|
|
|
1.0 |
Monastery of the Holy Eucharist, Marian Monks of the Eucharistic Adoration - Marian Hills, Lindogon, Simala, Sibonga, Cebu |
Electrical & Auxilliary Design/ Installation (Labor & Materials) |
Prime |
Marian Monks of the Eucharistic Adoration |
May 18, 2011 |
2.0 |
Monastery of the Holy Eucharist, Marian Monks of the Eucharistic Adoration - Marian Hills, Lindogon, Simala, Sibonga, Cebu |
Electrical & Auxilliary Design/ Installation (Labor & Materials) |
Prime |
Marian Monks of the Eucharistic Adoration |
Completed |
|
|
|
|
|
|
II.2 |
Schools & Universities: |
|
|
|
|
1.0 |
Quiot Pardo 4-Storey Classroom building - Quiot Pardo, Cebu City |
Electrical Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't., Corp. |
Dec. 04, 2006 |
2.0 |
Daughters of Mary Escolapias Convent - Guadalupe, Cebu City |
Electrical & Telephone Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't., Corp. |
Apr. 26, 2007 |
|
Blessed Trinity College- New Campus - Talibon, Bohol |
Electrical & Auxilliary Installation (Labor & Materials) |
Prime |
Order of Agustinian Recollets Sisters (OARS) |
Aug. 9, 2009 |
3.0 |
Installation of Feederline for AHU @ San Jose Bldg. - Main Campus, Magallanes St., Cebu City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
University of San Jose Recolletos |
June 16, 2010 |
4.0 |
Installation of Feederline for ACU at Mt. Carmel Bldg. - Main Campus, Magallanes St., Cebu City |
Electrical Works (Labor/Eqpt.) |
Prime |
University of San Jose Recolletos |
Jan. 17, 2011 |
5.0 |
Emergency Power Feeder Line for 1000 KVA Genset - Main Campus, Magallanes St., Cebu City |
Supply Labor/Materials & Installation |
Prime |
University of San Jose Recoletos |
May 24, 2011 |
6.0 |
Emergency Power System Feederlines for ACU Coliseum - Basak Campus, Basak, Pardo, Cebu City |
Supply Labor/Materials & Installation |
Prime |
University of San Jose Recolletos |
June 10, 2012 |
7.0 |
Rehabilitation & Upgrading of Distribution System at Canteen Area and Parish Ground Flr. Mt. Carmel Bldg. - Main Campus, Magallanes St., Cebu City |
Supply Labor/Materials & Installation |
Prime |
University of San Jose Recolletos |
Nov. 15, 2012 |
8.0 |
Electrical Works Installation for Our Lady of Consolation Annex Building - Basak Campus, Basak, Pardo, Cebu City |
Supply Labor/Materials & Installation |
Prime |
University of San Jose Recolletos |
On-going |
|
|
|
|
|
|
II.3 |
Public Market & Terminal: |
|
|
|
|
1.0 |
Danao Bus Terminal - Danao City |
Electrical Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't., Corp. |
Oct. 16, 2006 |
2.0 |
Bato Public Market & Terminal - Bato, Leyte |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
MAC BUILDERS |
Feb. 5, 2011 |
|
|
|
|
|
|
III. |
HOTEL & CONDOMINIUM: |
|
|
|
|
1.0 |
6-Storey Business Hotel Bldg. - Magallanes Street, Cebu City |
Electrical Works Installation (Labor & Materials) |
Sub-Contract |
DCD CONSTRUCTION INC. |
May 25, 2009 |
2.0 |
8 Storey with 1 Basement & Roof Deck Condominium - Escario, Lahug, Cebu City |
Electrical & Auxiliary Works (Labor/Eqpt.) |
Prime |
MYVAN PROPERTIES INC. |
Feb. 25, 2010 |
3.0 |
Castle Peak Hotel 2 - F. Cabahug St., Mabolo, Cebu City |
Electrical Works (Labor/Eqpt.) |
Prime |
Cebu Castle Peak Hotel, Inc. |
On-going |
4.0 |
14-Storey w/ 1-Basement & Roof Deck, Residential Condotel - F. Cabahug, Subangdaku, Mandaue City |
Electrical Works Installation (Labor/Eqpt) |
Prime |
MYVAN PROPERTIES INC. |
Feb. 24, 2012 |
5.0 |
4-Storey w/ Basement & Roof Deck, Dormitory Building - Talamban, Cebu City |
Electrical Works (Labor/Eqpt.) |
Prime |
TanEngSy Property Dev't. Corp. |
Completed |
6.0 |
Mactan Blue Coral Resort & Spa - Maribago, Lapu-lapu City |
Electrical Works (Labor/Eqpt.) |
Sub-Contract |
DUROS DEVT. CORP. |
Project Suspended Temporarily |
7.0 |
Mega One World Center - Brgy. Mactan, Lapulapu City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
DCD CONSTRUCTION INC. |
Jan. 12, 2012 |
8.0 |
Lot 8 High Rise Condominium - Tres Borces St., Mabolo, Cebu Cit |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Majestic Legacy Dev't. Corp. |
On-going |
9.0 |
Cityscape Tower 2 - J. Osmeña St., Cebu City |
Electrical Works (Labor/Eqpt.) |
Prime |
MYVAN PROPERTIES INC. |
On-going |
10.0 |
Electrical & Auxiliary Rough-Ins for Lower Ground & Upper Ground Richmond Hotel - Mandurriao, Iloilo City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
Megaworld Corporation |
On-going |
11.0 |
Green Island Residences - Marigondon, Lapu-lapu City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
EG & I Construction |
On-going |
12.0 |
Electrical & Auxiliary Works from Ground Floor to 10th Floor for 13-Storey Hotel - Marigondon, Lapu-lapu City |
Electrical Works (Labor/Eqpt.) |
Sub-Contract |
Ideal Builders |
On-going |
|
|
|
|
|
|
IV. |
COMMERCIAL PROJECT: |
|
|
|
|
1.0 |
Go Nuts Donut Store, Electrical Main Feeder line - Banilad Town Center, Banilad, Cebu City |
Upgrading of electrical main feeder line (Labor Only) |
Prime |
RNCC ENGINEERING WORKS |
Sept. 2005 |
2.0 |
Banilad Town Center Perimeter Lightings |
Installation of Roughing-Ins, Wirings, and Lighting Fixture (Labor Only) |
Prime |
Banilad Town Center Inc. |
Sept. 20, 2005 |
3.0 |
Salon D Rose, Banilad Town Center, Branch - 2nd Flr., North Arcade, Banilad Town Center, Banilad, Cebu City |
Upgrading of electrical main feeder line (Labor Only) |
Prime |
Salon The Rose |
November 25, 2005 |
4.0 |
2-Storey Commercial Building - Punta Princesa, Labangon, Cebu City |
Electrical Installation (Labor) |
Prime |
Mr. & Mrs Payusan |
January 5, 2006 |
5.0 |
EMCOR Branch Store - 2nd Flr. North Main Mall, Banilad Town Center, Banilad, Cebu City |
Electrical & Auxilliary Works Installation (Labor Only) |
Sub-Contract |
N GLENN GENERAL CONST. |
May 1, 2006 |
6.0 |
Banilad Town Center, 120 KVAR Capacitor Bank - Banilad Town Center, Banilad, Cebu City |
Installation of 1 unit capacitor bank, including wirings (Labor Only) |
Prime |
Banilad Town Center Inc. |
May 23, 2006 |
7.0 |
Naga Commercail Building - Colon, Naga |
Electrical & Auxilliary works Installation (Labor Only) |
Sub-Contract |
Dakay Construction & Dev't. Corp. |
May 25, 2006 |
8.0 |
Shell Canvas Store - 2nd Flr., South Arcade, Banilad Town Center, Banilad, Cebu City |
Electrical Design & Installation (Labor & Materials) |
Prime |
IMAGIMAX INTERIOR DESIGN |
July 27, 2006 |
9.0 |
PASEO- 1 NIGHT MARKET & ENTERTAINMENT - Panagdait St., Mabolo, Cebu City |
Electrical Installation (Labor & Materials) |
Sub-Contract |
CKE Electrical System |
June 8, 2007 |
10.0 |
Isuzu Iloilo Show Room & Service Center - West Diversion Road, Ilo-Ilo City |
Electrical & Auxilliary Works Installation (Labor & Materials) |
Prime |
Isuzu Cebu Inc. |
June, 2007 |
11.0 |
Goodwill Expansion - Kasuntingan, Mandaue City |
Electrical Design & Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't. Corp. |
June, 2007 |
12.0 |
Goodwill Expansion, Annex Building - Kasuntingan, Mandaue City |
Electrical Design & Installation (Labor & Materials) |
Sub-Contract |
Dakay Construction & Dev't. Corp. |
Jul. 21, 2007 |
13.0 |
SPICE FUSION RESTAURANT - SM City, North Reclamation Area, Cebu City |
Electrical Work Installation (Labor & Materials) |
Prime |
Spice Fusion Restaurant |
Nov. 17, 2007 |
14.0 |
SPORT BAR - Nat'l. Highway, Mandaue City |
Electrical Work Installation (Labor & Materials) |
Sub-Contract |
CKE Electrical System |
Nov. 21, 2007 |
15.0 |
North Atrium Commercial Building - Nat'l. Highway, Mandaue City |
Electrical & Telephone Work Installation (Labor Only) |
Sub-Contract |
CKE Electrical System |
April 1, 2008 |
16.0 |
PASEO-2 - Panagdait St., Mabolo, Cebu City |
Electrical Installation (Labor & Materials) |
Sub-Contract |
CKE Electrical System |
Aug. 10,2008 |
17.0 |
Banilad Town Center - Banilad, Cebu |
Electrical PreventiveMaintenance Work for Distribution System (Labor/Eqpt) |
Prime |
BANILAD TOWN CENTER INC. |
April 5, 2010 |
18.0 |
Dimsum Break- Parkmall - North Reclamation Area, Mandaue City |
Electrical Works Installation (Labor & Materials) |
Prime |
Harbour City Dimsum House Inc. |
May 20, 2010 |
19.0 |
Golden Cowrie Restaurant - Lahug, Cebu City |
Electrical Works Installation (Labor/Eqpt) |
Prime |
Cebu Golden Restaurant Inc. |
June 4, 2010 |
20.0 |
Dimsum Break- Jessa - Mango Avenue, Cebu City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Harbour City Dimsum House Inc. |
August 14, 2010 |
21.0 |
Profoods International Inc. - A.C. Cortes Avenue Ibabao, Mandaue City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Phil. Spring Water Inc. |
Sept. 17, 2010 |
22.0 |
Choi Garden Restaurant - Banilad Town Center Mall, Banilad, Cebu City |
Supply & Installation of Power Feederline (Labor/Eqpt. & Materials) |
Prime |
Royal Ventures Corp. |
Sept. 29, 2010 |
23.0 |
Manila Foodshoppe Inc. - Gaisano Mall Mactan Lapulapu City |
Supply & Installation (Labor/Eqpt. & Materials) |
Prime |
Manila Foodshoppe Inc. |
Oct. 20, 2010 |
24.0 |
Café Georg - Banilad, Cebu City |
Electrical Renovation of Kitchen (Labor/Eqpt. & Materials) |
Prime |
Mrs. Silvia L. Alcordo |
Oct. 20, 2010 |
25.0 |
Harbour Center Mactan - Marina Mall Pusok, Lapulapu City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Harbour City Dimsum House Inc. |
Feb. 2, 2011 |
26.0 |
6 Units Warehouse Complex - Brngy. Progreso, La Paz, Iloilo City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
ACGI METAPHIL DIVISION |
Completed |
27.0 |
Isuzu-Talisay - Talisay City, Cebu |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Isuzu Cebu Inc. |
May 18, 2011 |
28.0 |
Berovan Warehouse and Office Building - Basak, Mandaue City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Berovan Marketing Inc. |
June 7, 2012 |
29.0 |
Dimsum Break Restaurant-Pacific Mall - Estancia, Mandaue City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Harbour City Dimsum House Inc. |
July 21, 2011 |
30.0 |
Cebu Golden Restaurant Commissary - Banilad, Cebu City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Cebu Golden Restaurant Inc. |
Dec. 21, 2011 |
|
|
|
|
|
|
V. |
INDUSTRIAL PROJECT: |
|
|
|
|
1.0 |
Mandaue Foam Industries Inc., Commercial Bldg. - Quinten Salas, Ilo-Ilo City |
Electrical & Auxilliary Installation (Labor Only) |
Prime |
Mandaue Foam Industries Inc. |
Dec. 29, 2005 |
2.0 |
Rehabilitation of Electrical System of Mandaue Foam Industries Slicer building - H. Cortez, Subangdako, Mandaue City |
Electrical Design & Installation (Labor Only) |
Prime |
Mandaue Foam Industries Inc. |
Aug. 31,2006 |
3.0 |
Rehabilitation of Electrical System of Mandaue - Foam Industries Inc. Carpentry Building, H. Cortez, Subangdako, Mandaue City |
Electrical Design & Installation (Labor Only) |
Prime |
Mandaue Foam Industries Inc. |
Sept. 28, 2006 |
4.0 |
PASAR Refinery Expansion Building - Pasar, Isabel, Leyte |
Electrical & Auxilliary Works Installation (Labor Only) |
Sub-Contract |
PRIMARY STRUCTURE/LYRO |
Jan. 27, 2007 |
5.0 |
ISUZU Iloilo Show Room & Service Center |
Electrical Works Installation |
Prime |
Isuzu Cebu Inc. |
Sept. 30,2008 |
6.0 |
FORMAX/FORMAFLY WAREHOUSE, OFFICE AND SHOWROOM - Brgy. Marigondon, Lapu-Lapu City, Cebu |
Electrical Works Installation (Labor & Materials) |
Prime |
Formax International Corp. |
May 29,2008 |
7.0 |
MERAZENKO Electrical - MEPZ 2, Lapu-Lapu City |
Electrical & Auxilliary Works Installation (Labor & Materials) |
Sub-Contract |
DCD CONSTRUCTION INC |
April 18, 2009 |
8.0 |
APAC CUSTOMER SERVICES INC. - Pawing, Palo , Leyte |
Electrical Works (Labor/Eqpt.) |
Sub-Contract |
EASTRENCON |
April 24, 2009 |
9.0 |
Installation of Primary Power Line & Sub-Station for Warehouse Building - Maa, Davao, City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Phil. Spring Water Inc. |
March 18, 2010 |
10.0 |
Bacun AC Tunnel Rehabilation - Alelim, Ilocos Sur |
Design & Supply Labor/Materials including Installation of Lightings, Transformers & 2-Units 250 KVA CAT. Genset |
Sub-Contract |
ACGI METAPHIL DIVISION |
Sept. 26, 2012 |
11.0 |
Electrical Renovation of CENAPRO RK-4 Bldg. - Jagobiao, Mandaue City, Cebu |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
ACGI METAPHIL DIVISION |
April 12, 2012 |
12.0 |
StreetLightings Works Phase 1 - Mandurriao, Iloilo City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
MEGAWORLD CORPORATION |
On-Going |
|
|
|
|
|
|
VI. |
RENOVATION, UP-GRADING & AS-BUILT/FOUND PLAN PREPARATION: |
|
|
|
|
1.0 |
Renovation of BIR-7, Training Room - Cabantan, Mabolo, Cebu City |
Electrical Design & Installation (Labor & Materials) |
Sub-Contract |
Riche Construction Services |
Completed |
2.0 |
Preparation of As-Found Electrical & Fire Alarm System Plan for the entire School Campus- USJR-Main Campus, Magallanes St, Cebu City |
Supply Labor & Technical Personnel |
Prime |
University of San Jose Recoletos |
July 21,2007 |
3.0 |
University of San Jose Recoletos High School - Basak, Cebu City |
Electrical Renovation of High School Library (Labor/Eqpt. & Materials) |
Prime |
University of San Jose Recoletos |
June 16, 2010 |
4.0 |
Up-Grading of Electrical Power Distribution High School & Auditorium Bldg. - San Sebastian College-Recoletos, Claro M. Recto Avenue Metro Manila |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
San Sebastian College- Recolletos |
June 16, 2010 |
5.0 |
Preparation of Electrical System As-Found Plan for The Entire School Campus - San Sebastian College-Recoletos, Claro M. Recto Avenue Metro Manila |
Electrical As-built Preparation & Load Auditing |
Prime |
San Sebastian College- Recolletos |
August 31, 2010 |
6.0 |
Preparation of Electrical System As-Found Plan for The Entire Factory & Installation of Load side metering System for 3 Sub-Station - MERASENKO CORP., MEPZ II- SEPZ, Lapu-lapu City |
Supply Labor & Materials,Technical Supervision, including installation |
Prime |
MERASENKO CORP. |
Jan. 9, 2012 |
7.0 |
Preparation of Electrical As-Built/As-Found Plan - Basak Campus, Basak, Pardo, Cebu City |
Electrical As-built Preparation & Load Auditing |
Prime |
University of San Jose Recoletos |
June 10, 2012 |
8.0 |
Electrical Upgrading of Building 2 - MERASENKO CORP., MEPZ II- SEPZ, Lapu-lapu City |
Supply Labor & Materials, Technical Supervision, including installation |
Prime |
MERASENKO CORP. |
August 8, 2012 |
9.0 |
Electrical Upgrading of Distribution System for 2-Storey Pension House - Panganiban St., Cebu City |
Electrical Works (Labor/Eqpt. & Materials) |
Prime |
Mrs. Amor Peliña |
On-Going |
10.0 |
Electrical Works of Relocation of 3-333 KVA Transformer Power Supply - Cityscape 1, Panagdait Cebu City |
Electrical Works (Labor/Eqpt. & Materials) |
Sub-Contract |
MYVAN PROPERTIES INC. |
On-Going |